The insulation spraying was continued over the next two weeks.
Uncooperative weather delayed the spraying yet again.
The spraying needs to take place outdoors do to the chemicals used during the spraying.
The entry “Construction Techniques: Spray Foam Insulation” covers the spraying methods and chemical bases more thoroughly.
When weather kept the ELEMENT indoors, the student workers finished work installing electrical outlets and running HVAC ducts and piping in the Mechanical Room.
For more information about the Mechanical System see “Mechanical Systems Integration: Vapor Compression System.”

Modules are Rolled Outdoors on the Rail System which serves as its Foundation

Modules are Lifted off Rails (This Same System will be used to Install the ELEMENT during Competition)

Installation of the Forced Air Portion of the HVAC System

The Living and Bedroom Modules Outdoors awaiting Insulation Installation